BRICKS is the operating system for a UK property business, from the first viewing to the standing portfolio.
From the first postcode to a reasoned offer on the table.
Run every deal through nine stages, from first lead to final exit: appraisal, offer, legals, finance, refurb, snagging and out. Each stage carries its own checklist, so the searches, the chases and the certificates are tracked, not remembered.
Deals rarely die on price, they die in the gaps, a missed search or a chase that never happened. A pipeline that tells you what is next keeps every deal moving.
Appraise any strategy on its own terms: buy-to-let, HMO, flip, refurb-to-refinance (BRRR) and serviced accommodation. BRICKS works out net monthly cashflow, ROI, cash left in after refinance, GDV and profit on cost, and stress-tests the deal against a rate rise so you see the downside, not just the headline.
Most deals look good on a headline yield and lose money in the detail. You walk into a viewing knowing the number you can pay, not the number you hope works.
Tick through the property room by room on the viewing, flag every issue with a photo, and BRICKS turns it into a priced schedule of works. A built-in review then prompts for the works people commonly forget, the companion jobs and the compliance items.
Your refurb budget is built from what you actually saw, not a finger-in-the-air guess. You still price and sense-check the works; BRICKS keeps the schedule and the evidence together.
Type a postcode and read the site before you commit: Article 4 directions, conservation areas, listed buildings, flood risk, coal mining, radon, national parks and live flood warnings, alongside sold-price comparables. It is a first read of the recorded constraints, not a substitute for your own due diligence.
One Article 4 direction or flood zone can turn a profit into a loss, or a house into something you cannot mortgage. Catch the deal-killers in two minutes, not two weeks into legals.
Generate an offer letter that lays out the reasoning behind your number, the condition, the works and the comparables, ready to send.
Agents and vendors take you seriously when the offer reads like a buyer who has done the work, not a chancer with a lowball.
When a deal moves to refurb, the programme takes over.
Once a deal hits refurb, BRICKS gives you a full construction programme: a Gantt you build yourself or import from your builder's own schedule, with a linked task table underneath.
Overruns cost money you have already borrowed. The moment a phase slips you see the new completion date and exactly how far off plan you are.
Every phase and task has an owner. Tap the owner and a contact card opens with their mobile, email and role, pulled from your contractor vault. Call or email without leaving the programme.
When the plasterer is late you want their number in one tap, not a dig through your phone.
Log each site meeting against a proper agenda, attach photos straight from your phone, and record the decisions. Flag a delay against a phase and BRICKS pushes that phase and everything after it, and updates the completion date.
The programme stays honest. The slip you agreed on site is on the chart by the time you are back in the car, and you can see what it did to the finish date.
The held portfolio, tracked the way a landlord actually needs.
Every property you hold on one wall, grouped by strategy, each showing rent in, costs out and net cashflow, with a growth chart over time.
You see what the portfolio actually earns, not what you think it earns.
A compliance engine runs a colour-coded clock on every legal obligation: gas safety, EICR, EPC, insurance and licences. Green when in date, amber when due, red when lapsed.
One glance tells you what is in date, what is due and what could cost you a fine. A lapsed gas certificate is a criminal offence. BRICKS keeps the dates and the warning states in front of you; checking and renewing the certificate stays with you.
Forecast the cash leaving the portfolio: mortgage payments, insurance, service charges and recurring costs, filterable so you can see exactly what is due and when.
No nasty surprises at the bank. You see the money going out before it goes.
The admin layer that holds the whole thing together.
Grout reads your deals and your documents so you do not have to. Ask it to search a deal, turn an email thread into a list of actions, draft a quotation, tender or planning statement, or read a document you drop in and log the dates, certificates and terms automatically.
Admin is where your hours go. Grout hands them back, and makes sure the action buried halfway down an email actually gets done.
Raise a clean invoice in seconds with your company name, number and address, for your time, mileage and expenses, then export a tidy PDF.
In a joint venture the value you bring vanishes if it is never written down. Capture your time and costs as you go and claim everything you are owed, and everything you can against tax.
Comms and documents sit against each deal, your diary and deadlines live in the in-product calendar, and Planning Watch monitors live applications so a decision finds you without you refreshing the council portal.
Your business should not live across a dozen apps and a notes folder. BRICKS keeps the working record attached to the property.